Main Drain Road Construction

Koo Wee Rup
Client
Cardinia Shire Council
Project Duration
5 Months
Meet the team involved
About Us

Linct Group completed the sealing of Main Drain Road which covers 4945 lineal meters.
A desalination line  covers an area of 860 lineal meters. Linct Group were able to accommodate the  permit application and approval process into their construction program. Work  methods were modified to ensure the protection of the asset, such as through  the use of a pneumatic roller to minimise vibration.  

Several  environmental challenges were present including the construction of Bandicoot  crossings to facilitate the movement of the Southern Brown Bandicoot which  resides in the area.

Drainage works were completed by Linct Group, ensuring no waste was deposited into the nearby Melbourne Water drain. Silt fencing was installed on each outlet to ensure this.

Our Role

  • Large scale  earthworks  
  • Road reshape and stabilisation
  • Traffic Management
  • Environmental Management
  • Drainage works
  • Treatment of soft spots