Horrocks Highway Shoulder Sealing & Pavement Rehabilitation

Rochester, SA
Client
Department for Infrastructure & Transport / Downer EDI Works Pty Ltd
Project Duration
3 Months
Meet the team involved
About Us

This project entails the wet mixing and formation of approximately 8.8KM of road network on the Horrocks Highway between Brinkworth and Rochester. In-situ wet mixing has been utilised to effectively treat the sub grade before an overlay of PM1/20 Pavement Material completes the construction process prior to spray seal.

Our Role

  • In Situ PavementMixing
  • Importation of PM1
  • Drainage product supply and installation
  • Longitudinal Table Drain Installation
  • Pavement Construction
  • Traffic Management