li { color: #FFF; } li p { color: #000; }
This project entails the wet mixing and formation of approximately 8.8KM of road network on the Horrocks Highway between Brinkworth and Rochester. In-situ wet mixing has been utilised to effectively treat the sub grade before an overlay of PM1/20 Pavement Material completes the construction process prior to spray seal.